Importing Workspaces: Default Field Values and Valid Entries |
When you import workspaces there are many field types that can or must be mapped from your import (.xls or .csv) file and Changepoint PPM. Possible fields and their default values are listed below, along with valid entry formats.
Required fields must be included in the import file and mapped during import.
Some fields in PPM cannot be mapped during import:
These unmappable fields are listed below.
The following fields can be mapped during the import process. If a field is required the value must come from the import file so there is no default.
Mappable Native Fields
Field Name |
Required? |
Default Value |
Valid Entry/Format |
Entry Example |
Name |
yes |
from file |
Text up to 200 characters. |
Software Localization. |
Approval Notes |
|
Null |
Text up to 1 million characters long. |
Project approved by steering committee. |
Budget |
|
0 |
Integer or decimal. Do not use a currency symbol. |
15,000.00 or 15.000,00
|
Description |
|
Null |
Text. If a field fails it will not be imported. |
This project holds all items for our PMO initiatives. |
Manager |
|
Null |
User Name. Will be used to map to Changepoint PPM user. |
Thomas Darcy. |
Parent |
yes, if workspace type cannot be top-level workspace |
from file (if required, otherwise "None") |
Workspace name. If the same name is used more than once in PPM, the first workspace with that name will be selected. |
Global Initiatives. |
Planned Finish |
|
1 month after Planned Start, unless workspace is "Ongoing" |
Based on culture settings.
|
07/18/2007 or 30/04/2008. |
Planned Start |
|
Defaults to current date (date of import) unless Planned Finish is provided, in which case defaults to 1 month prior to Planned Finish. |
Based on culture settings |
07/18/2008 or 30/04/2008. |
Priority |
|
"High" |
1,2,3,4,5 or High, Medium High, Medium, Medium Low, Low |
3 or Medium. |
Status |
|
"Active" |
Active, Archived |
Active. |
Estimated Expenses |
|
0 |
Integer or decimal. |
15,000.00 or 15.000,00
|
Health |
|
"On Plan" |
On Plan, In Trouble, Needs Attention |
On Plan. |
Phase |
|
Null |
Text that matches an entry based on the workspace type's Phase settings. |
Initiation. |
State |
|
"Not Started" |
Not Started, In Progress, On Hold, Completed, Cancelled |
In Progress. |
Mappable Custom Fields
Field Type |
Default Value |
Valid Entry |
Entry Example |
Currency |
Null |
Integer or decimal. |
15,000.00 or 15.000,00 |
Date |
Null |
Based on culture settings |
07/18/2007 or 30/04/2008 |
Integer |
Null |
Integer between -2,147,483,648 and 2,147,483,647 |
150 |
Decimal |
Null |
Decimal up to 38 digits. |
570.35689 |
Member |
Null |
User Name. Will be used to map to Changepoint PPM user. |
Thomas Darcy |
Percent |
0% |
Integer or decimal |
98% |
Pick List (see note below for multi-select and using the pre-defined Countries list) |
Null |
Text/Numeric, if a field fails it will not be imported. |
On Time |
Status |
Based on selected default value. |
Text up to 3500 characters long. |
Up to date |
Text |
Null |
Text up to 3500 characters long. |
Project nearing completion. |
Yes/No |
Null |
Yes, No, yes, no |
Yes |
Note:Multi-select pick list fields with multiple values and pick lists that use the pre-defined Countries list have special formatting requirements for import.
The following fields cannot be mapped during import. Default field values are automatically assigned.
Unmappable Native Fields
Field Name |
Default Value |
EnterpriseID |
Enterprise ID. |
Display Task Application |
Set by template or workspace type. |
Track Time at Item |
Set by template or workspace type. |
Is Template |
No. |
Has Timesheet |
No. |
Approval Status |
"Not Required". |
Capacity |
No. |
Created By |
User who imported workspace. |
Update Notes |
"Status fields updated with initial values". |
Item Number |
Populated based on seed/incrementer values of the workspace type. |
RequestTypeID |
Null. |
Schedule % Complete |
0%. |
Scheduled Cost |
Calculated. |
Updated By |
User who imported workspace. |
Estimated Work |
Calculated. |
Estimated Labor Cost |
Calculated. |
Total Planned Labor Cost |
Calculated. |
Total Estimated Cost |
Calculated. |
Total Actual Labor Cost |
Calculated. |
Total Scheduled Work |
Calculated. |
Total Actual Work |
Calculated. |
Scheduled Start |
Calculated. |
Scheduled Finish |
Calculated. |
Scheduled Duration |
Calculated. |
Unmappable Custom Field Types
Field Type |
Default Value |
Aggregate |
Calculated. |
Calculation |
Calculated. |
Hyperlink | none |
Item Number |
Calculated. |
For help on the steps in the wizard click the step name:
Step 1 - Select Workspace Type | Step 2 - Select File to Import | Step 3 - Map File Fields to Changepoint PPM Fields | Step 4 - Specify Workspace Roles | Step 5 - Map Users | Step 6 - Preview | Step 7 - Summary